Update on projects at Braefield Farm
The roof on the addition is partially complete. Roofers have been held up by rain.
The painting of the Tenant House (Jim and Margaret) is also on hold because of rain.
It was quite a sight watching John, Jimmy, and Polly all mowing the large pasture together today with the tractor and two riding mowers.
John and Polly also worked on the fences Saturday and Sunday.
Unfortunately it starting to look as if we will need to replace the fence line along the drive as most of the posts and boards are in bad shape.
The painting of the Tenant House (Jim and Margaret) is also on hold because of rain.
It was quite a sight watching John, Jimmy, and Polly all mowing the large pasture together today with the tractor and two riding mowers.
John and Polly also worked on the fences Saturday and Sunday.
Unfortunately it starting to look as if we will need to replace the fence line along the drive as most of the posts and boards are in bad shape.
Labels: Braefield Farm Restoration
0 Comments:
Post a Comment
<< Home